This job is 3rd floor Hult Plaza at 10th and Mill. I will be turning this office and reception area into a future waiting area. It entails removing existing formica built in desks and cabinets, removing a 6 foot section of wall, including sliding window, remodeling another 3 foot section of wall by removing the window and closing it in with drywall and finishing it with plaster.
During and after demolition.
After Drywall and a couple coats of plaster.
No comments:
Post a Comment